Current through December 10, 2024
Rule 6-4-4.5 - Application Requirements The application must include the following:
A. A detailed description of the project and narrative explaining how the specific improvements will affect economic development and/or job creation in the area, together with supporting documentation.B. Engineering/Architects Report: This should include a cost estimate and timeline. Cost estimate must be submitted by an engineer or architect on their letterhead as a signed and stamped original. The timeline should outline the project construction from implementation to the completion of construction .D. Memorandum of Agreement.E. Executed copy of the Resolution of Authorization for DIP fundsF. Copy of building title and lease (applicable if the project includes a building purchase construction, or rehabilitation)G. E-Verification for the applicant and benefitting businessH. Detailed Map showing location of proposed project. Maps must explicitly correspond to the proposed scope of activities within this project.I. The applicant must submit one original of the application to MDA. Complete application must be submitted with bottom tabbed dividers in between each attachment. All documentation should have original signatures.J. Applications can be mailed to: Mississippi Development Infrastructure Program, Mississippi Development Authority, Community Services Division, Post Office Box 849, Jackson, Mississippi. MDA will evaluate the application to determine if the project meets program criteria.Miss. Code Ann. § 57-61-36 (Rev. 2014).