The energy savings plus related cost savings are guaranteed by the ESCO and must be used to repay the cost of the project. The guaranteed savings must be more than sufficient to pay the total costs of the project over the guarantee period. The terms of any shared savings or energy saving performance contract entered into must contain a guarantee of savings clause from the performance contractor.
6 Miss. Code. R. 3-4.9