37 Miss. Code R. § 1-6203-00800-103

Current through August 31, 2024
Section 37-1-6203-00800-103

Prime contractors shall be required to provide the Project Engineer with justification and supporting documentation when it is found that the DBE goal was not met.

37 Miss. Code. R. § 1-6203-00800-103