37 Miss. Code R. § 1-6203-00600-600

Current through August 31, 2024
Section 37-1-6203-00600-600

The prime contractor may be required to provide information and documentation as a result of an investigation or on-site review into non-compliance issues. All such request will go through the District Engineer of the area where the project is being performed.

37 Miss. Code. R. § 1-6203-00600-600