Miss. Code. tit. 33, pt. 8, Appendices, app 33-8-G

Current through December 10, 2024
Appendix 33-8-G - Local Assistance and Other State Programs Annual Work plan Section 1452(g)(2) - Safe Drinking Water Act Amendments of 1996

INTRODUCTION

The Mississippi State Department of Health (MSDH), Bureau of Public Water Supply (Department), will use the Local Assistance and Other State Programs Set-aside of the DWSRF in a wellhead protection and assistance program. The program will be eliminating inactive wells and/or open holes which pose a contamination risk to the state's groundwater aquifers, by properly abandoning them in accordance with state guidelines. Local governments realize that the inactive wells/open holes pose a risk of contamination to the groundwater which may be utilize via their active wells; however, funds to properly abandon wells/holes are limited. The financial assistance provided through this set-aside will allow the state, by way of contractual agreement(s), to identify and then properly abandon inactive wells/open holes posing contamination risks to the state's groundwater aquifers.

SELECTION PROCESS

The contract for coordination of the decommissioning/properly closing inactive water wells/open holes was bid and awarded; the contract will run through June 30, 2017. A new contract for the decommissioning/properly closing inactive water wells/open holes is currently being developed in accordance with new State contracting requirements.

An Invitation For Bids (IFBs) for the coordination of the decommissioning/properly closing inactive water wells/open holes was sent to qualified potential contractors. Bids received were reviewed by the Department to select the lowest and best bid for the agency. Recommendations for award of a contract were presented to the Board at their regularly scheduled Board meeting; following authorization by the Board, the coordination contract was awarded.

The contracts for the coordination and decommissioning/properly closing inactive water wells/open holes currently reside as following:

The first contract (the coordination contract) - Mississippi Rural Water Association (MsRWA).

The second contract (closure contract) - is currently being developed in accordance with new State contracting requirements .

PROGRAM ACTIVITIES

The activities described herein will be accomplished through a four part process: Identification of wells / holes needing proper abandonment for the protection of aquifers and the overall public health; communication with public water supply that owns well/hole to encourage proper abandonment; mobilization of well contractor to identified site to perform the work; and confirmation that the work has been completed.

Identification - The contractor will use a list provided by the Department through a cooperative effort with the Mississippi Department of Environmental Quality Office of Groundwater Resources (MDEQ) to identify wells or open holes owned by particular water systems to be abandoned. Wells/holes deemed high risk by MDEQ will be sought out first for abandonment. Upon completion, wells/holes that are considered medium risk will be addressed next, then low risk.

Communication - Staff from the contractor will meet with system officials to encourage them to properly abandon existing inactive wells or open holes posing risk of contamination to their water system and aquifer. This is considered essential to successfully achieving the goal of abandoning those wells/holes posing risk.

Mobilization - Once the communication phase has been completed, staff of the MSW&MW, the licensed well driller contractor and the well closure coordinator will mobilize to the selected site and commence with the proper abandonment of the well/hole. This will be accomplished in accordance with established guidelines set forth by the MDEQ Office of Groundwater. When the abandonment is complete, the well contractor will contact the well closure coordinator to inform them of project completion.

Confirmation - Staff of the well closure coordinator will perform site visits to confirm proper abandonment of the wells/holes. When the abandonment is confirmed, the well closure coordinator will notify the Department to ensure that each abandoned well matches invoices submitted for payment.

SCHEDULE FOR COMPLETING ACTIVITIES

The schedule for completing Local Assistance and Other Program activities under this work plan will be the schedule established by set contractual dates.

AGENCY RESPONSIBILITIES

The MSDH will be monitoring contractors throughout the process to ensure effective completion of contractual assignments.

EVALUATION PROCESS TO ASSESS THE SUCCESS OF SET-ASIDE ACTIVITIES

The success of this set-aside will be defined by the ability of the MSDH through the solicited contractor(s) to remove by proper abandonment wells or open holes that potentially pose a risk to existing water supplies and the aquifers which supply the well water.

Miss. Code. tit. 33, pt. 8, Appendices, app 33-8-G

Adopted 2/19/2017