33 Miss. Code. R. 6-VII

Current through May 31, 2024
Section 33-6-VII - FFY-2016 Priority List

FINAL

Fiscal Year - 2016 Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program Priority List

Category I: Segmented Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Tunica County Utility District

Jackson County Utility Authority

Repair & Paint Elevated Storage Tanks

Distribution System Improvements

38676

39567

3533

1732

10000

43680

$175,500

$0

$0

$0

$702,000

$6,250,000

$702,000

$6,952,000

Category II: Previous Year Certified Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Mendenhall, City of

Installation of 8" PVC

39114

6081

2504

$31,358

$209,050

$7,161,050

Category III: Primary Drinking Water Standards Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Yazoo, City of

New Well/Water Distribution System

39194

2866

16400

$500,000

$0

$1,855,557

$9,016,607

Category IV: One Well Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Duffee Water Association

500 GPM Water Well

39337

868

2617

$111,946

$0

$746,307

$9,762,914

Category V: Pressure Deficiencies Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Jackson, City of

Distribution System Improvements (Phase I)

39201

37222

174382

$500,000

$0

$2,440,400

$12,203,314

Natchez, City of

New 500,000 Ga. Tank/Distribution Lines

39120

5979

18340

$500,000

$1,675,800

$13,879,114

North Lauderdale Water Assn.

New 500,000 Gal. Elevated Tank/Replace

39320

2528

10000

$0

$0

$1,562,200

$15,441,314

Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Bear Creek Water Assn.

Installation of 16"and 20" Water Mains

39046

1829

40000

$0

$0

$4,100,000

$19,541,314

Category VIII: Back-up Water Supply Sources Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Winona, City of

New Water Well

38967

6515

5800

$100,625

$0

$402,500

$19,943,814

Madison, City of

Construction of IMil Gallon Storage Tank

39110

1664

13986

$0

$0

$2,800,895

$22,744,709

Category IX: Existing Facilities Upgrade (Meeting Primary Standards)

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Jackson, City of

O B Curtis Water Treatment Improvements (Phase

39201

25940

174382

$500,000

$0

$3,501,800

$26,246,509

Jackson, City of

J H Fewell Water Treatment Improvements (Phase I)

39201

18464

174382

$500,000

$0

$4,919,720

$31,166,229

Lumberton, City of

Replace/Upgrade Water Mains

39455

2440

2228

$276,975

$1,107,900

$32,274,129

Wiggins, City of

1000 GPM Well/3,000 ft.8" Main/Seal Well

39577

1055

4747

$402,667

$0

$1,610,668

$33,884,797

* The "Funding Line" indicates the funds which are anticipated to be available for loans in FFY-2016 based on the funds authorized and provided by the 2016 Legislature. The funding available in FFY-2016 should equal $41,164,967.

** Currently, the requirements of additional subsidization are unknown. Once the final federal appropriation with related requirements is made, additionalmodifications will be made to the priority system and ranking to integrate the federal requirements as necessary. Funding Sources

PF - Principal Forgiveness - Method of Subsidization the state has elected to use.

CPF - Cumulative Principal Forgiveness

CGI - Cumulative Green Infrastructure Green Infrastructure Project Codes

E - Energy Efficiency, W - Water Efficiency, G - Green Infrastructure, El - Environmentally Innovative Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure, and/or are environmentally innovative. Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans.

This determination of Green Infrastructure will be based on guidelines supplied by the Environmental Protection Agency.

FINAL

Fiscal Year - 2017 and After Planning List Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program

(Projects included on the Planning List did not meet the September 30, 2015 deadline for submission of a complete facilities plan, or had multiple requests and asked to be placed on the Planning List. These projects have been ranked on the Planning List based on information provided on the Request for Ranking Form. A determination of project eligibility cannot be completed until the facilities plan has been submitted and reviewed.)

Category II: Previous Year Certified Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Sylvarena Water Assn.

New Water Well

39153

259

786

$0

$0

$1,100,000

$1,100,000

Valley Park Water Assn., Inc.

New Well/Install 36 New Meters

39177

65

731

$0

$0

$629,400

$1,729,400

Category III: Primary Drinking Water Standards Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

5277

10000

$0

$0

$470,000

$2,199,400

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

4232

10000

$0

$0

$586,000

$2,785,400

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

4232

10000

$0

$0

$586,000

$3,371,400

Ebenezer Rural Water Assn.

Back-up Water Well

39095

616

765

$0

$0

$621,000

$3,992,400

Category V: Pressure Deficiencies Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Aberdeen, City of

400 GPM Well/100,000 Gal. Elev.Tank/Rehab

39730

2316

6415

$370,487

$1,481,949

$5,474,349

Guntown, City of

Water Sys. Improvements/Valves/Lines/Meters

38849

1219

2912

$0

$0

$975,000

$6,449,349

------------------------------------------------------------------------------------------------------------------.. Funding Line $7,280,170-------------------------------------------------------------------------------------------------------------------

Ridgeland, City of

New 1,600 GPM Well/500,000 Gallon Tank

39158

491

24000

$0

$3,434,404

$9,883,753

Ridgeland, City of

Two 1,600 GPM Ser. Pumps/Rehab Current

39158

348

24000

$0

$4,840,000

$14,723,753

Category VI: Source Water Protection Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Batesville, City of

Rehab Existing Facilities

38606

9629

7600

$102,500

$410,000

$15,133,753

Walnut, Town of

Installation of Water Lines/2 Master water Meters

38683

3064

1397

$0

$0

$256,000

$15,389,753

Pearl River Central Water Assn.

Install/reconnect 32,800 LF PVC Water Main

39426

2647

12800

$0

$0

$1,464,705

$16,854,458

Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount ! Requested

Statewide Cum.

$

Batesville, City of

Installation of Water lines

38606

31582

7600

$37,500

$125,000

$16,979,458

Batesville, City of

Installation of Water Lines

38606

26319

7600

$37,500

$150,000

$17,129,458

Ridgeland, City of

Enhance Distribution System/Install 12 in. Lines

39157

15710

24000

$0

$0

$830,375

$17,959,833

Batesville, City of

Rehab/Replacement of Existing Facilities

38606

14356

7600

$68,750

$275,000

$18,234,833

Batesville, City of

Rehab Existing Facilities

38606

11279

7600

$87,500

$350,000

$18,584,833

McComb, City of

1000 GPM Well/Generator/Fence/I 2" Main

39648

6589

12790

$0

$0

$1,236,000

$19,820,833

Batesville, City of

500,000 Gallon Elevated Tank

38606

5264

7600

$187,500

$750,000

$20,570,833

Brandon, City of

1000 GPM Well/1 Ml Gal Above Ground

39042

2504

26355

$0

$0

$4,275,000

$24,845,833

Bay Springs, Town of

New 1,000 GPM Well

39422

2254

2000

$340,010

$617,000

$25,462,833

Southeast Rankin Water Assn., Inc.

New Water Well/Water Distribution System

39151

1393

0

$0

$0

$1,154,000

$26,616,833

SE Greene Water Authority

Upgrade Existing Distribution System

39452

296

1572

$0

$0

$2,649,569

$29,266,402

Helena Utility District

Enhance Water Distribution System

39562

149

700

$0

$0

$1,883,000

$31,149,402

Nicholson Water & Sewer Assn.

Installation of Approx. 10,400 L.F. of Water Main

39463

82

3500

$270,450

$0

$1,803,000

$32,952,402

Category VIII: Back-up Water Supply Sources Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Batesville, City of

Rehab Existing Infrastructure

38606

7896

7600

$125,000

$500,000

$33,452,402

Batesville, City of

New 750 GPM Well

38606

7896

7600

$125,000

$500,000

$33,952,402

Ridgeland, City of

1,600 GPM Potable Water Well

39158

3663

24000

$0

$2,189,300

$36,141,702

Hilldale Water Association, Inc

300,000 Gal. Elevated Tank

39180

1520

5400

$0

$1,184,490

$37,326,192

Hazlehurst, City of

New Well & Raw Water Line

39083

1412

4400

$375,000

$0

$1,500,000

$38,826,192

Mt. Gilead-Improve Water Assoc.

New Water Treatment Plant/Elevated Tank Rehab

39429

896

3000

$0

$0

$1,357,400

$40,183,592

Horn Lake, City of

New Well/Tank Upgrade Existing Facility

38637

485

1500

$0

$0

$2,474,600

$42,658,192

Marion, Town of

600 GPM Tr. Facil/600 GPM Well/Generator

39342

367

2000

$500,000

$2,748,800

$45,406,992

Category IX: Existing Facilities Upgrade (Meeting Primary Standards)

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Ridgeland, City of

Upgrade/Replace Existing Water Lines

39157

18530

24000

$0

$0

$704,000

$46,110,992

Ridgeland, City of

Water Line Relocation

39158

10108

24000

$0

$793,400

$46,904,392

Collins, Town of

Water Line Replacement

39428

9961

4000

$48,664

$139,040

$47,043,432

Collins, Town of

Water Line Replacement

39428

8766

4000

$55,300

$158,000

$47,201,432

Collins, Town of

Water Line Replacement

39428

8766

4000

$55,300

$158,000

$47,359,432

Grenada, City of

2 500 GPM Wells/500,000 Gallon Elevated Tank

38901

4391

22951

$500,000

$2,202,700

$49,562,132

Mount Olive, Town of

Replacement of Water Lines

39119

2348

1000

$80,962

$231,320

$49,793,452

Alcorn Co. Water Association

300,000 Gal Storage Tank/upgrade Facilities

38834

1187

6500

$190,965

$1,273,101

$51,066,553

Alcorn Co. Water Association

Renovate Elevated tanks/Replace Water Lines

38834

1155

6500

$130,938

$872,920

$51,939,473

Mendenhall, City of

New 500 GPM Well/250,000 Gal Tank/Treatment

39114

531

2504

$138,750

$2,634,100

$54,573,573

White Oak Water Assn.

New Water Well

39117

467

831

$0

$0

$611,000

$55,184,573

* The "Funding Line" indicates the funds which are anticipated to be available for loans in FFY-2016 based on the funds authorized and provided by the 2016 Legislature. The funding available in FFY-2016 should equal $41,164,967.

**Currently, the requirements of additional subsidization are unknown. Once it has been determined by the final federal appropriation, additional modifications will be made to the priority system and ranking to integrate the federal requirements as necessary. Funding Sources

PF - Principal Forgiveness - Method of Subsidization the state has elected to use.

DW - Drinking Water System Improvement Revolving Loan Fund - includes repayments, interest and FFY-2014 Capitalization Grant.

Green Infrastructure Project Codes

E - Energy Efficiency,

W - Water Efficiency,

G - Green Infrastructure,

El - Environmentally Innovative

Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure, and/or are environmentally innovative. Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans. This determination of Green Infrastructure will be based on guidelines supplied by the Environmental Protection Agency.

33 Miss. Code. R. 6-VII

Adopted 2/14/2016