33 Miss. Code. R. 5-VII

Current through May 31, 2024
Section 33-5-VII - FFY-2015 Priority List

FINAL

Fiscal Year - 2015 Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program Priority List

Category II: Previous Year Certified Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Mendenhall, City of

Installation of 8" PVC

39114

6081

2504

$33,225

$209,050

$209,050

Wiggins, City of

1000 GPM Well/3,000 ft.8" Main/Seal Well

39577

1055

4747

$0

$0

$1,610,668

$1,819,718

Category III: Primary Drinking Water Standards Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

6020

10000

$0

$0

$412,000

$2,231,718

Yazoo, City of

New Well/Water Distribution System

39194

2866

16400

$0

$0

$1,855,557

$4,087,275

Taylorsville, Town of

New Water Well/Rehab Existing Storage Tank

39168

927

2000

$0

$0

$815,000

$4,902,275

Category IV: One Well Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Duffee Water Assoc.

Backup Well

39337

868

2617

$82,409

$746,307

$5,648,582

Category V: Pressure Deficiencies Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Bear Creek Water Associations, Inc.

Installation of 12" and 16" Water Mains

39046

7141

40000

$0

$0

$1,600,000

$7,248,582

Natchez, City of

New 500,000 Ga. Tank/Distribution Lines

39120

5979

18340

$418,950

$1,675,800

$8,924,382

Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Madison, City of

Construction of 1Mil Gallon Storage Tank

39110

1664

13986

$0

$0

$2,800,895

$11,725,277

Jumpertown, Town of

Water Dist. System Improvements

38829

574

1500

$0

$0

$938,060

$12,663,337

Tupelo, City of

Upgrade Water Distribution System

38802

152

34500

$0

$0

$659,000

$13,322,337

Brookhaven, City of

Water Distribution Extension

39602

133

12515

$0

$0

$3,000,000

$16,322,337

Category VIII: Back-up Water Supply Sources Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Winona, City of

New Water Well

38967

6515

5800

$140,875

$0

$402,500

$16,724,837

Magee's Creek W/A

Construct New 150,000 Gal. Tank/Treatment

39667

2785

7992

$438,550

$0

$1,253,000

$17,977,837

Category IX: Existing Facilities Upgrade (Meeting Primary Standards)

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Lumberton, City of

Replace/Upgrade Water Mains

39455

2440

2228

$276,975

$1,107,900

$19,085,737

FINAL

Fiscal Year - 2016 and After Planning List Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program

(Projects included on the Planning List did not meet the September 30, 2014 deadline for submission of a complete facilities plan, or had multiple requests and asked to be placed on the Planning List. These projects have been ranked on the Planning List based on information provided on the Request for Ranking Form. A determination of project eligibility cannot be completed until the facilities plan has been submitted and reviewed.)

Category II: Previous Year Certified Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Mendenhall, City of

New 500 GPM Well/250,000 Gal Tank/Treatment

39114

531

2504

$138,750

$2,634,100

$2,634,100

Category III: Primary Drinking Water Standards Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

5277

10000

$0

$0

$470,000

$3,104,100

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

4232

10000

$0

$0

$586,000

$3,690,100

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

4232

10000

$0

$0

$586,000

$4,276,100

Tunica County Utility District

Repair & Paint Elevated Storage Tanks

38676

3533

10000

$0

$0

$702,000

$4,978,100

Okatoma Water Association

New Well/Elevated Tank/Treatment System

38911

891

3405

$0

$0

$1,545,000

$6,523,100

Bude, Town of

New WellAVater System Improvements

39630

400

1037

$500,000

$1,643,000

$8,166,100

Category IV: One Well Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Center Water Association, Inc.

Construct 200,000 Gal Elevated Tank/Rehab Well

39426

2157

5760

$0

$0

$908,500

$9,074,600

Category V: Pressure Deficiencies Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Carthage, City of

Upgrade Booster Station's Controls

39051

103189

4637

$5,000

$20,000

$9,094,600

Carthage, City of

Upgrade and Replace Water Mains, Booster Station

39051

8255

4637

$67,500

$250,000

$9,344,600

Clayton Village Water Association,

New Generator/Upgrade Existing System

39759

4184

5000

$137,550

$393,000

$9,737,600

Forest, City of

Rehab Existing Storage Tank

39074

2535

5968

$283,750

$1,135,000

$10,872,600

Aberdeen, City of

400 GPM Well/100,000 Gal. Elev.Tank/Rehab

39730

2316

6415

$370,487

$1,481,949

$12,354,549

Forest, City of

New 900 GPM Well

39074

1799

5968

$400,000

$1,600,000

$13,954,549

Guntown, City of

Water Sys. Improvements/Valves/Lines/Meters

38849

1219

2912

$0

$0

$975,000

$14,929,549

Ridgeland, City of

New 1,600 GPM Well/500,000 Gallon Tank

39158

491

24000

$0

$3,434,404

$18,363,953

Ridgeland, City of

Two 1,600 GPM Ser. Pumps/Rehab Current

39158

348

24000

$0

$4,840,000

$23,203,953

Category VI: Source Water Protection Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Walnut, Town of

Installation of Water Lines/2 Master water Meters

38683

3064

1397

$0

$0

$256,000

$23,459,953

Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Batesville, City of

Installation of Water lines

38606

31582

7600

$37,500

$125,000

$23,584,953

Batesville, City of

Installation of Water Lines

38606

26319

7600

$37,500

$150,000

$23,734,953

Ridgeland, City of

Enhance Distribution System/Install 12 in. Lines

39157

15710

24000

$0

$0

$830,375

$24,565,328

Batesville, City of

Rehab/Replacement of Existing Facilities

38606

14356

7600

$68,750

$275,000

$24,840,328

Batesville, City of

Rehab Existing Facilities

38606

11279

7600

$87,500

$350,000

$25,190,328

Batesville, City of

Rehab Existing Facilities

38606

9629

7600

$102,500

$410,000

$25,600,328

Pearl, City of

Water System Improv./Well Trans. Lines/Standpipe

39208

8487

26232

$0

$0

$1,150,000

$26,750,328

Batesville, City of

500,000 Gallon Elevated Tank

38606

5264

7600

$187,500

$750,000

$27,500,328

Bay Springs, Town of

New 1,000 GPM Well

39422

2254

2000

$340,010

$617,000

$28,117,328

Southeast Rankin Water Assn., Inc.

New Water Well/Water Distribution System

39151

1393

0

$0

$0

$1,154,000

$29,271,328

SE Greene Water Authority

Upgrade Existing Distribution System

39452

296

1572

$0

$0

$2,649,569

$31,920,897

Helena Utility District

Enhance Water Distribution System

39562

149

700

$0

$0

$1,883,000

$33,803,897

Nicholson Water & Sewer Assn.

Installation of Approx. 10,400 L.F. of Water Main

39463

82

3500

$270,450

$0

$1,803,000

$35,606,897

Funding Line $37,363,325

Jackson County Utility Authority

Water Distribution System Improvements

39567

4

450

$0

$0

$6,250,000

$41,856,897

Category VIII: Back-up Water Supply Sources Projects

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Batesville, City of

New 750 GPM Well

38606

7896

7600

$125,000

$500,000

$42,356,897

Batesville, City of

Rehab Existing Infrastructure

38606

7896

7600

$125,000

$500,000

$42,856,897

Old River Water Association, Inc.

Installation of New Remote Read Meter

39669

3769

3575

$0

$0

$477,600

$43,334,497

Ridgeland, City of

1,600 GPM Potable Water Well

39158

3663

24000

$0

$2,189,300

$45,523,797

North Lauderdale Water Assn.

New 500,000 Gal. Elevated Tank/Replace

39320

2528

10000

$0

$0

$1,562,200

$47,085,997

Hilldale Water Association, Inc

300,000 Gal. Elevated Tank

39180

1520

5400

$0

$1,184,490

$48,270,487

Hazlehurst, City of

New Well & Raw Water Line

39083

1412

4400

$375,000

$0

$1,500,000

$49,770,487

Mt. Gilead-Improve Water Assoc.

New Water Treatment Plant/Elevated Tank Rehab

39429

896

3000

$0

$0

$1,357,400

$51,127,887

Horn Lake, City of

New Well/Tank Upgrade Existing Facility

38637

485

1500

$0

$0

$2,474,600

$53,602,487

Marion, Town of

600 GPM Tr. Facil/600 GPM Well/Generator

39342

367

2000

$500,000

$2,748,800

$56,351,287

Category IX: Existing Facilities Upgrade (Meeting Primary Standards)

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

Carthage, City of

Backup Generator

39051

20638

4637

$25,000

$100,000

$56,451,287

Ridgeland, City of

Upgrade/Replace Existing Water Lines

39157

18530

24000

$0

$0

$704,000

$57,155,287

Carthage, City of

Install Generator/Upgrade Existing Facilities

39051

12140

4637

$42,500

$170,000

$57,325,287

Ridgeland, City of

Water Line Relocation

39158

10108

24000

$0

$793,400

$58,118,687

Collins, Town of

Water Line Replacement

39428

9961

4000

$48,664

$139,040

$58,257,727

Collins, Town of

Water Line Replacement

39428

8766

4000

$55,300

$158,000

$58,415,727

Collins, Town of

Water Line Replacement

39428

8766

4000

$55,300

$158,000

$58,573,727

West Point, City of

Upgrade SCADA/Chlorine Analyzer/Paint 5

39773

7049

16500

$217,500

$870,000

$59,443,727

Grenada, City of

2 500 GPM Wells/500,000 Gallon Elevated Tank

38901

4391

22951

$500,000

$2,202,700

$61,646,427

Mount Olive, Town of

Replacement of Water Lines

39119

2348

1000

$80,962

$231,320

$61,877,747

Alcorn Co. Water Association

300,000 Gal Storage Tank/upgrade Facilities

38834

1187

6500

$190,965

$1,273,101

$63,150,848

Alcorn Co. Water Association

Renovate Elevated tanks/Replace Water Lines

38834

1155

6500

$130,938

$872,920

$64,023,768

Edwards, Town of

Construction of Ozone Treatment Facility

39066

449

1980

$235,500

$1,570,000

$65,593,768

Category XIII: Other

Project

Project Description

Zip Code

Priority Points

Service Area Population

Eligible PF

Green Project

Loan Amount Requested

Statewide Cum.

$

NTS Utility Assoc.

Radio Read Meters

39307

4390

5700

$0

$432,845

$66,026,613

* The "Funding Line" indicates the funds which are anticipated to be available for loans in FFY-2015 based on the funds authorized and provided by the 2015 Legislature;-obtaining-the FFY- 2015 Federal Capitalization Grant which is supplied by EPA; and repayments and interest on previous loans. The funding available in FFY-2015 should equal $37,363,325.

Funding Sources

PF - Principal Forgiveness - Method of Subsidization the state has elected to use.

CPF - Cumulative Principal Forgiveness

CGI - Cumulative Green Infrastructure

Green Infrastructure Project Codes

E - Energy Efficiency, W - Water Efficiency, G - Green Infrastructure, El - Environmentally Innovative

Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure, and/or are environmentally innovative. Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans. This determination of Green Infrastructure will be based on guidelines supplied by the Environmental Protection Agency.

33 Miss. Code. R. 5-VII

Adopted 10/25/2015