Section 33-4-VII - FFY-2015 Priority List

FINAL

Fiscal Year - 2015 Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program Priority List

Category II: Previous Year Certified Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Mendenhall, City of Installation of 8" PVC 39114 6081 2504 $33,225 $209,050$209,050
Wiggins, City of 1000 GPM Well/3,000 ft.8" Main/Seal Well 39577 1055 4747 $0 $1,610,668 $0 $1,819,718
Category III: Primary Drinking Water Standards Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Tunica County Utility District Repair & Paint Elevated Storage Tanks 38676 6020 10000 $0 $0 $412,000 $2,231,718
Yazoo, City of New Well/Water Distribution System 39194 2866 16400 $0 $0 $1,855,557 $4,087,275
Taylorsville, Town of New Water Well/Rehab Existing Storage Tank 39168 927 2000 $0 $0 $815,000 $4,902,275
Category IV: One Well Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Duffee Water Assoc. Backup Well 39337 868 2617 $82,409 $746,307 $5,648,582
Category V: Pressure Deficiencies Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Bear Creek Water Associations, Inc. Installation of 12" and 16" Water Mains 39046 7141 40000 $0 $0 $1,600,000 $7,248,582
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Madison, City of Construction of 1Mil Gallon Storage Tank 39110 1664 13986 $0 $0 $2,800,895 $10,049,477
Brookhaven, City of Install Water Main/Rehab Existing Facilities 39602 1221 13300 $500,000 $3,925,130 $13,974,607
Jumpertown, Town of Water Dist. System Improvements 38829 574 1500 $0 $0 $938,060 $14,912,667
Tupelo, City of Upgrade Water Distribution System 38802 152 34500 $0 $0 $659,000 $15,571,667
Brookhaven, City of Water Distribution Extension 39602 133 12515 $0 $0 $3,000,000 $18,571,667
Category VIII: Back-up Water Supply Sources Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Winona, City of New Water Well 38967 6515 5800 $140,875 $0 $402,500 $18,974,167
Magee's Creek W/A Construct New 150,000 Gal. Tank/Treatment 39667 2785 7992 $438,550 $0 $1,253,000 $20,227,167
Category IX: Existing Facilities Upgrade (Meeting Primary Standards)
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Lumberton, City of Replace/Upgrade Water Mains 39455 2440 2228 $276,975 $1,107,900 $21,335,067

* The "Funding Line" indicates the funds which are anticipated to be available for loans in FFY-2015 based on the funds authorized and provided by the 2014 Legislature; obtaining the remainder of the FFY-2013 Federal Capitalization Grant and the FFY-2014 Federal Capitalization Grant which are supplied by EPA; and repayments and interest on previous loans. The funding available in FFY-2015 should equal $37,363,325.

** Currently, the requirements of additional subsidization are unknown. Once the final federal appropriation with related requirements is made, additional modifications will be made to the priority system and ranking to integrate the federal requirements as necessary.

Funding Sources

PF - Principal Forgiveness Method of Subsidization the state has elected to use.

CPF - Cumulative Principal Forgiveness

CGI - Cumulative Green Infrastructure

Green Infrastructure Project Codes

E - Energy Efficiency, W - Water Efficiency, G - Green Infrastructure, EI - Environmentally Innovative Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure, and/or are environmentally innovative. Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans. This determination of Green Infrastructure will be based on guidelines supplied by the Environmental Protection Agency.

FINAL

Fiscal Year - 2016 and After Planning List Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program

(Projects included on the Planning List did not meet the September 30, 2014 deadline for submission of a complete facilities plan, or had multiple requests and asked to be placed on the Planning List. These projects have been ranked on the Planning List based on information provided on the Request for Ranking Form. A determination of project eligibility cannot be completed until the facilities plan has been submitted and reviewed.)

Category II: Previous Year Certified Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Mendenhall, City of New 500 GPM Well/250,000 Gal Tank/Treatment 39114 531 2504 $138,750 $2,634,100 $2,634,100
Category III: Primary Drinking Water Standards Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Tunica County Utility District Repair & Paint Elevated Storage Tanks 38676 5277 10000 $0 $0 $470,000 $3,104,100
Tunica County Utility District Repair & Paint Elevated Storage Tanks 38676 4232 10000 $0 $0 $586,000 $4,276,100
Tunica County Utility District Repair & Paint Elevated Storage Tanks 38676 3533 10000 $0 $0 $702,000 $4,978,100
Okatoma Water Association New Well/Elevated Tank/Treatment System 38911 891 3405 $0 $0 $1,545,000 $6,523,100
Bude, Town of New Well/Water System Improvements 39630 400 1016 $500,000 $1,643,000 $8,166,100
Category IV: One Well Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Center Water Association, Inc. Construct 200,000 Gal Elevated Tank/Rehab Well 39426 2157 5760 $0 $0 $850,500 $9,016,600
Category V: Pressure Deficiencies Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Carthage, City of Upgrade Booster Station's Controls 39051 103189 4637 $5,000 $20,000 $9,036,600
Carthage, City of Upgrade and Replace Water Mains, Booster Station 39051 8255 4637 $67,500 $250,000 $9,286,600
Natchez, City of New 500,000 Ga. Tank/Distribution Lines 39120 5979 18340 $418,950 $1,675,800 $10,962,400
Clayton Village Water Association, New Generator/Upgrade Existing System 39759 4184 5000 $137,550 $393,000 $11,355,400
Forest, City of Rehab Existing Storage Tank 39074 2535 5968 $283,750 $1,135,000 $12,490,400
Aberdeen, City of 400 GPM Well/100,000 Gal. Elev.Tank/Rehab 39730 2316 6415 $370,487 $1,481,949 $13,972,349
Forest, City of New 900 GPM Well 39074 1799 5968 $400,000 $1,600,000 $15,572,349
-------------------------------------------------------------Funding Line $16 028 258 ---------------------------------------------------------------
Guntown, City of Water Sys. Improvements/Valves/Lines/Meters 38849 1219 2912 $0 $0 $975,000 $16,547,349
Ridgeland, City of New 1,600 GPM Well/500,000 Gallon Tank 39158 491 24000 $0 $3,434,404 $19,981,753
Ridgeland, City of Two 1,600 GPM Ser. Pumps/Rehab Current 39158 348 24000 $0 $4,840,000 $24,821,753
Category VI: Source Water Protection Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Walnut, Town of Installation of Water Lines/2 Master water Meters 38683 3064 1397 $0 $0 $256,000 $25,077,753
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Batesville, City of Installation of Water lines 38606 31582 7600 $37,500 $125,000 $25,202,753
Batesville, City of Installation of Water Lines 38606 26319 7600 $37,500 $150,000 $25,352,753
Ridgeland, City of Enhance Distribution System/Install 12 in Lines 39157 15710 24000 $0 $0 $830,375 $26,183,128
Batesville, City of Rehab/Replacement of Existing Facilities 38606 14356 7600 $68,750 $275,000 $26,458,128
Batesville, City of Rehab Existing Facilities 38606 11279 7600 $87,500 $350,000 $26,808,128
Batesville, City of Rehab Existing Facilities 38606 9629 7600 $102,500 $410,000 $27,218,128
Batesville, City of 500,000 Gallon Elevated Tank 38606 5264 7600 $187,500 $750,000 $27,968,128
Bay Springs, Town of New 1,000 GPM Well 39422 2254 2000 $340,010 $617,000 $28,585,128
Helena Utility District Enhance Water Distribution System 39562 149 700 $0 $0 $1,883,000 $30,468,128
Nicholson Water & Sewer Assn. Installation of Approx. 10,400 L.F. of Water Main 39463 82 3500 $270,450 $0 $1,803,000 $32,271,128
Jackson County Utility Authority Water Distribution System Improvements 39567 4 450 $0 $0 $6,250,000 $38,521,128
Category VIII: Back-up Water Supply Sources Projects
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Batesville, City of New 750 GPM Well 38606 7896 7600 $125,000 $500,000 $39,021,128
Batesville, City of Rehab Existing Infrastructure 38606 7896 7600 $125,000 $500,000 $39,521,128
Ridgeland, City of 1,600 GPM Potable Water Well 39158 3663 24000 $0 $2,189,300 $41,710,428
Hilldale Water Association, Inc 300,000 Gal. Elevated Tank 39180 1520 5400 $0 $1,184,490 $42,894,918
Hazlehurst, City of New Well & Raw Water Line 39083 1412 4400 $375,000 $0 $1,500,000 $44,394,918
Horn Lake, City of New Well/Tank Upgrade Existing Facility 38637 485 1500 $0 $0 $2,474,600 $46,869,518
Marion, Town of 600 GPM Tr. Facil/600 GPM Well/Generator 39342 367 2000 $500,000 $2,748,800 $49,618,318
Category IX: Existing Facilities Upgrade (Meeting Primary Standards)
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
Carthage, City of Backup Generator 39051 20638 4637 $25,000 $100,000 $49,718,318
Ridgeland, City of Upgrade/Replace Existing Water Lines 39157 18530 24000 $0 $0 $704,000 $50,422,318
Carthage, City of Install Generator/Upgrade Existing Facilities 39051 12140 4637 $42,500 $170,000 $50,592,318
Ridgeland, City of Water Line Relocation 39158 10108 24000 $0 $793,400 $51,385,718
Collins, Town of Water Line Replacement 39428 9961 4000 $48,664 $139,040 $51,524,758
Collins, Town of Water Line Replacement 39428 8766 4000 $55,300 $158,000 $51,682,758
Collins, Town of Water Line Replacement 39428 8766 4000 $55,300 $158,000 $51,840,758
West Point, City of Upgrade SCADA/Chlorine Analyzer/Paint 5 39773 7049 16500 $217,500 $870,000 $52,710,758
Grenada, City of 2 500 GPM Wells/500,000 Gallon Elevated Tank 38901 4391 22951 $500,000 $2,202,700 $54,913,458
Mount Olive, Town of Replacement of Water Lines 39119 2348 1000 $80,962 $231,320 $55,144,778
Alcorn Co. Water Association 300,000 Gal Storage Tank/upgrade Facilities 38834 1187 6500 $190,965 $1,273,101 $56,417,879
Alcorn Co. Water Association Renovate Elevated tanks/Replace Water Lines 38834 1155 6500 $130,938 $872,920 $57,290,799
Edwards, Town of Construction of Ozone Treatment Facility 39066 449 1980 $235,500 $1,570,000 $58,860,799
Category XIII: Other
ProjectProject DescriptionZip CodePriority PointsService Area PopulationEligible PFGreen ProjectLoan Amount RequestedStatewide Cum. $
NTS Utility Assoc. Radio Read Meters 39307 4390 5700 $0 $432,845 $59,293,644

* The "Funding Line" indicates the funds which are anticipated to be available for loans in FFY-2015 based on the funds authorized and provided by the 2014 Legislature; obtaining the remainder of the FFY-2013 Federal Capitalization Grant and the FFY-2014 Federal Capitalization Grant which are supplied by EPA; and repayments and interest on previous loans. The funding available in FFY-2015 should equal $37,363,325.

**Currently, the requirements of additional subsidization are unknown. Once it has been determined by the final federal appropriation, additional modifications will be made to the priority system and ranking to integrate the federal requirements as necessary. Funding Sources

PF - Principal Forgiveness Method of Subsidization the state has elected to use.

DW - Drinking Water System Improvement Revolving Loan Fund includes repayments, interest and FFY-2014 Capitalization Grant.

Green Infrastructure Project Codes

E - Energy Efficiency,

W - Water Efficiency,

G - Green Infrastructure,

EI - Environmentally Innovative

Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure, and/or are environmentally innovative. Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans. This determination of Green Infrastructure will be based on guidelines supplied by the Environmental Protection Agency.

33 Miss. Code. R. 4-VII

Amended 2/22/2015