33 Miss. Code. R. 2-3.7.4

Current through June 25, 2024
Rule 33-2-3.7.4 - Construction Deficiencies
3.7.4.1 In the event that it appears to the Department that the loan recipient and registered engineer are not assuring that the construction work, materials, equipment or supplies are in conformity with approved plans and specifications, the Department may determine such work unallowable for DWSIRLF loan participation, unless the loan recipient takes such action, through the registered engineer if applicable, in the manner provided for in the construction contract to correct any deficiencies.
3.7.4.2 The Department may immediately withhold DWSIRLF loan payments for such time that it appears that the loan recipient and registered engineer are not assuring that construction work, materials, equipment or supplies are in accordance with the approved plans, specifications and contract documents, and may require the loan recipient to repay any previously paid amounts related to such work within 30 days of such notification.

33 Miss. Code. R. 2-3.7.4

Miss. Code Ann. § 41-3-16(3)(b)
Amended 7/31/2016
Amended 5/25/2017