FINAL
Fiscal Year - 2023 Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program Priority List
Project | Project Description | Zip Code | Priority Points | Service Area Population | Eligible PF Amount | Loan Amount Requested | Statewide Cum. $ |
Category III: Primary Drinking Water Standards Projects | |||||||
Utica, Town of | Rehab/ Replacement of Existing Facilities | 39175 | 1059 | 1085 | $294,427 | $654,282 | $654,282 |
Friars Point, Town of | Pressure Deficiencies | 38631 | 662 | 1200 | $500,000 | $850,000 | $1,504,282 |
Shuqualak, Town of | Extending Public Water Service to Unserved Areas | 39361 | 176 | 575 | $500,000 | $2,844,000 | $4,348,282 |
Category IV: One Well Projects | |||||||
Benoit, Town of | New Well | 38725 | 151 | 498 | $500,000 | $1,843,500 | $6,191,782 |
Winterville Water Association | New Water Well | 38703 | 64 | 108 | $456,435 | $1,014,300 | $7,206,082 |
Category V: Pressure Deficiencies Projects | |||||||
Vaiden, Town of | New Filters, New Water Mains, New Meters | 39176 | 1664 | 2503 | $382,500 | $850,000 | $8,056,082 |
Batesville, City of | New Well/ Storage Tank | 38606 | 1268 | 9973 | $500,000 | $4,482,780 | $12,538,862 |
Bay St. Louis, City of | New Well | 39520 | 1029 | 9284 | $300,000 | $2,606,651 | $15,145,513 |
Pisgah Water Association, Inc. | New Water Well and Distribution Improvements | 39047 | 508 | 2144 | $0 | $1,600,000 | $16,745,513 |
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses | |||||||
Eupora, City of | Extend Service to Unserved Area/ Continued Project | 39744 | 1580 | 5564 | $308,250 | $1,233,000 | $17,978,513 |
Bernard Bayou Industrial District | Paint 2 Elevated Storage Tanks | 39503 | 846 | 6000 | $0 | $354,675 | $18,333,188 |
West Jackson Co. Utility District | Rehab/ Replacement of Existing Facilities | 39564 | 500 | 29000 | $0 | $5,000,000 | $23,333,188 |
Kiln Utility & Fire District of | Rehab Approx.10.3 Miles of Water Dist. System | 39556 | 47 | 6349 | $440,370 | $4,564,744 | $27,897,932 |
West Harrison Water and Sewer | Water Distribution Improvements | 39571 | 44 | 17210 | $500,000 | $3,926,743 | $31,824,675 |
Jackson County Utility Authority | Consolidating/ Connect to Underserved Area | 39567 | 37 | 75000 | $0 | $6,985,000 | $38,809,675 |
Harrison Co. Utility Authority | Service to Existing Unserved Areas | 39503 | 31 | 624 | $360,000 | $2,477,550 | $41,287,225 |
Category VIII: Back-up Water Supply Sources Projects | |||||||
Central Water Association | Rehab/ Replacement of Existing Facilities | 39350 | 3392 | 20143 | $490,000 | $1,400,000 | $42,687,225 |
Meridian, City of | New Well | 39301 | 2794 | 36347 | $500,000 | $6,699,116 | $49,386,341 |
Wiggins, City of | Water Distribution Improvement/ New Well | 39577 | 440 | 4390 | $500,000 | $3,773,463 | $53,159,804 |
Harrison County Utility Authority | Service to Existing Underserved Area | 39503 | 34 | 850 | $500,000 | $4,409,400 | $57,569,204 |
Category IX: Existing Facilities Upgrade (Meeting Primary Standards) | |||||||
Clarkdale Water Association | SCADA Upgrade | 39301 | 11242 | 4000 | $12,868 | $92,032 | $57,661,236 |
Evergreen Water Association | Water Main Replacement | 39043 | 10127 | 3100 | $0 | $110,000 | $57,771,236 |
Highway 28 Water Association | Distribution Improvements | 39111 | 5327 | 1500 | $36,750 | $105,000 | $57,876,236 |
Crystal Springs, City of | Rehab/ Replacement of Existing Facilities | 39059 | 5271 | 5050 | $138,880 | $396,800 | $58,273,036 |
Ebenezer Water Association | Water Main Replacement | 39095 | 4608 | 765 | $37,350 | $83,000 | $58,356,036 |
Double Ponds Water Association | New Well, Tank Rehab, Treatment Plant Rehab | 39474 | 4575 | 2500 | $84,000 | $240,000 | $58,596,036 |
-------------------------------Funding Line----------------------------- | |||||||
Pearl, City of | New Water Well | 38701 | 4186 | 26500 | $330,000 | $2,200,000 | $60,796,036 |
Star Water Company | Distribution Improvements | 39167 | 3830 | 993 | $0 | $100,000 | $60,896,036 |
Natchez Water Works | Rehab/ Replacement of Existing Facilities | 39121 | 3756 | 15792 | $500,000 | $3,250,000 | $64,146,036 |
Hattiesburg, City of | Rehab/ Replacement of Existing Facilities | 39403 | 3598 | 45951 | $500,000 | $5,573,133 | $69,719,169 |
Union Water Association | Distribution Improvements/ Elevated Tank Rehab | 39151 | 2673 | 750 | $11,025 | $73,500 | $69,792,669 |
N.E. Itawamba Water Assn. | Rehab/ Replacement of Existing Facilities | 38847 | 2100 | 4700 | $364,725 | $810,500 | $70,603,169 |
Central Yazoo Water Association | New Elevated Water Tank & SCADA Upgrades | 10001 | 1876 | 9960 | $500,000 | $1,500,000 | $72,103,169 |
Brookhaven, City of | Rehab/ Replacement of Existing Facilities | 39206 | 1482 | 12500 | $500,000 | $3,870,350 | $75,973,519 |
Lorman Waterworks Association | Treatment Plant/ Distribution Improvements | 39096 | 1274 | 2000 | $433,800 | $964,000 | $76,937,519 |
Alcorn Co. Water Association # 1 | 300,000 Gal Storage Tank/upgrade Facilities | 38834 | 1214 | 6500 | $445,585 | $1,273,101 | $78,210,620 |
Alcorn Co. Water Association #2 | Renovate Elevated tanks/Replace Water Lines | 38834 | 1181 | 6500 | $305,522 | $872,920 | $79,083,540 |
Crystal Springs Water Service | Water System Improvements | 39059 | 1083 | 5050 | $500,000 | $1,931,368 | $81,014,908 |
Clarkdale Water Association | Replacing Asbestos Pipe | 39301 | 827 | 4000 | $500,000 | $2,066,000 | $83,080,908 |
Hattiesburg, City of | Rehab/ Replacement of Existing Facilities | 39403 | 638 | 41951 | $500,000 | $5,951,500 | $89,032,408 |
L & F Water Association | Rehab Tank/ Treatment Facilities | 39098 | 632 | 0 | $427,500 | $950,000 | $89,982,408 |
Midway Community Water Assn. | Rehab/ Replacement of Existing Facilities | 39039 | 522 | 1680 | $500,000 | $1,980,000 | $91,962,408 |
Union, City of | Rehab/ Replacement of Existing Facilities | 39365 | 442 | 1897 | $460,013 | $3,066,750 | $95,029,158 |
Quitman, City of | Rehab/ Replacement of Existing Facilities | 39355 | 424 | 2386 | $500,000 | $2,613,060 | $97,642,218 |
Braxton, Town of | Treatment Plant | 39044 | 378 | 775 | $105,000 | $700,000 | $98,342,218 |
Raymond, City of | Replace Water Mains/Hydrants/Rehab Storage Tank | 39154 | 324 | 2894 | $0 | $2,400,000 | $100,742,218 |
Crawford, Town of | Elevated Tank Rehabilitation | 39743 | 257 | 631 | $500,000 | $2,086,400 | $102,828,618 |
Jumpertown, Town of | Rehab/ Replacement of Existing Facilities | 38829 | 242 | 1150 | $500,000 | $2,458,600 | $105,287,218 |
Copiah Water Association | Rehab/ Replacement of Existing Facilities | 39083 | 213 | 2200 | $500,000 | $1,900,000 | $107,187,218 |
Raymond, City of | Replace Water Mains/ Hydrants/ Rehab Storage | 39154 | 207 | 2894 | $500,000 | $3,750,000 | $110,937,218 |
Decatur, Town of | Rehab/ Replacement of Existing Facilities | 39327 | 193 | 1705 | $281,025 | $1,873,500 | $112,810,718 |
Hickory, Town of | New Well/ Elevated Tank/ Pipe Extension | 39332 | 189 | 1000 | $500,000 | $4,629,771 | $117,440,489 |
Highway 98 East Water Assn. | Replace Approx. 50,000 LF Water Mains | 39429 | 172 | 1650 | $500,000 | $1,220,000 | $118,660,489 |
Crenshaw, Town of | Elevated Storage Tank, Distribution Improvements | 38621 | 163 | 588 | $500,000 | $3,169,810 | $121,830,299 |
Winterville Water Association | Rehab/ Replacement of Existing Facilities | 38703 | 130 | 90 | $233,100 | $518,000 | $122,348,299 |
Sardis, City of | Distribution Improvements | 38666 | 101 | 1756 | $500,000 | $1,788,550 | $124,136,849 |
Poplar Springs Water District | Rehab/ Replacement of Exis ting Facilities | 39114 | 88 | 1188 | $500,000 | $4,534,031 | $128,670,880 |
* kalona, City of | Rehab/ Replacement of Existing Facilities | 38860 | 73 | 2700 | $500,000 | $2,592,250 | $131,263,130 |
Lake Water Works | Tank Rehab, New Water Mains | 39092 | 69 | 439 | $0 | $3,300,400 | $134,563,530 |
Harrison County Utility Authority | Distribution Improvements | 39503 | 21 | 624 | $500,000 | $6,950,000 | $141,513,530 |
Copiah County Industrial Park | Rehab/Replacement of Existing Facilities | 39077 | 7 | 1062 | $500,000 | $2,783,000 | $144,296,530 |
Category XIII: Other | |||||||
Verona, City of | New Generator | 38879 | 18098 | 3019 | $54,900 | $122,000 | $144,418,530 |
Note: See section VLB. of this document for more details. Applications exceeding a loan request of $5,000,000 require further approval by the Board. See section IV.C.1 of this document.
Note: Eligible Principal Forgiveness Amount listed here is based on the process outlined for the base cap grant allotment (Section VI.A.5a). Potential Loan Recipients ranked highest on the program's Priority List serving a population with a Median Household Income less than $49,111 (MS MHI) will be eligible to receive BIL funding that allows for 100% principal forgiveness loans to the extent funding allows (Section VI.A.5b).
FFY-2023 Planning List
FINAL
Fiscal Year - 2024 and After Planning List
Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program
Projects included on the Planning List did not meet all submission deadlines, are not projected to be ready to proceed during the FFY, or had multiple requests and asked to be placed on the Planning List. These projects have been ranked on the Planning List based on information provided on the submitted Request for Ranking Form.
A determination of a project's program eligibility cannot be completed until the facilities plan has been submitted and reviewed.
Project | Project Description | Zip Code | Priority Points | Service Area Population | Eligible PF Amount | Loan Amount Requested | Statewide Cum. $ |
Category III: Primary Drinking Water Standards Projects | |||||||
Mound Bayou, City of | Pressure Deficiencies | 38762 | 741 | 1500 | $0 | $850,000 | $850,000 |
Edwards, Town of | New Charcoal Filtration System | 39066 | 260 | 1050 | $0 | $2,685,000 | $3,535,000 |
Category IV: One Well Projects | |||||||
Falcon, Town of | Back-up Well, Distribution Improvements | 38670 | 35 | 96 | $500,000 | $1,998,676 | $5,533,676 |
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses | |||||||
G.T.&Y Utility District | Service to New Area/ Capacity Improvements | 38901 | 342 | 4000 | $500,000 | $3,178,316 | $8,711,992 |
West Harrison Water & Sewer | Installation of New Water Connections | 39571 | 125 | 20000 | $307,583 | $1,230,330 | $9,942,322 |
Jackson County Utility Authority | Expansion to Unserved Area/ Consolidation | 39567 | 118 | 12000 | $0 | $3,810,000 | $13,752,322 |
Category VIII: Back-up Water Supply Sources Projects | |||||||
Aberdeen, Town of | 400 P Well/100,000 Gal. Elev.Tank/Rehab Lines | 39730 | 2128 | 6415 | $500,000 | $1,481,949 | $15,234,271 |
Cason Water Association | Surface Water Connection | 38858 | 1623 | 4543 | $435,575 | $1,244,500 | $16,478,771 |
Mt. Olivet Water Association | New Well/Paint Elevated Tank | 38606 | 708 | 1300 | $129,010 | $516,040 | $16,994,811 |
Braxton, Town of | Construction of New Well | 39044 | 288 | 775 | $122,850 | $819,000 | $17,813,811 |
Category IX: Existing Facilities Upgrade (Meeting Primary Standards) | |||||||
Hernando, City of | Treatment Plant Upgrades and Distribution Impro | 38632 | 7626 | 15000 | $0 | $931,000 | $18,744,811 |
CS&I Water Association | Rehab/ Replacement of Existing Facilities | 39150 | 6450 | 945 | $0 | $80,000 | $18,824,811 |
Carthage, City of | Rehab/ Replacement of Existing Facilities | 39051 | 5079 | 5075 | $255,150 | $567,000 | $19,391,811 |
Clarksdale Public Utilities | Rehab/ Replacement of Existing Facilities | 39814 | 4654 | 17962 | $500,000 | $2,375,000 | $21,766,811 |
Hattiesburg, City of | Rehab/ Replacement of Existing Facilities | 39403 | 3598 | 45591 | $500,000 | $11,146,266 | $32,913,077 |
Philadelphia Utilities | Rehab Water Plant | 39350 | 2963 | 7477 | $0 | $1,723,000 | $34,636,077 |
West Tallahatchie Utilities Assn. | Rehab/ Replacement of Existing Facilities | 38966 | 2282 | 7500 | $0 | $1,643,067 | $36,279,144 |
Clinton, City of | New Well/ Distribution Improvements | 39056 | 2010 | 28100 | $435,000 | $4,084,100 | $40,363,244 |
Midway Community Water | Distribution Improvements | 39039 | 1667 | 1680 | $0 | $620,000 | $40,983,244 |
Bear Creek Water Assn., Inc. | Replace Tank With New 2 Mil Gal Tank | 39046 | 1534 | 45000 | $0 | $4,890,000 | $45,873,244 |
Webb, Town of | Repair/Rehab Water Tank | 38966 | 1250 | 586 | $105,840 | $235,200 | $46,108,444 |
Wiggins, City of | Replacing Asbestos Pipe | 1059 | 4390 | $0 | $1,568,657 | $47,677,101 | |
Canton Municipal Utilities | Water System Improvements | 39046 | 1036 | 8000 | $500,000 | $2,825,000 | $50,502,101 |
H&H Water System, Inc. | Distribution Improvements | 39080 | 1030 | 3012 | $367,500 | $1,050,000 | $51,552,101 |
Isola, Town of | Rehab/ Replacement of Existing Facilities | 38754 | 903 | 713 | $209,250 | $465,000 | $52,017,101 |
Clarksdale Public Utilities | Replacing Wells and Distribution | 39814 | 732 | 17962 | $500,000 | $15,110,000 | $67,127,101 |
Casey Jones Water Association | Rehab/ Replacement of Existing Facilities | 39179 | 713 | 1112 | $405,000 | $900,000 | $68,027,101 |
Shannon, Town of | Rehab/ Replacement of Existing Facilities | 38868 | 691 | 1850 | $0 | $1,079,325 | $69,106,426 |
Metcalfe, Town of | Rehab/ Replacement of Existing Facilities | 38760 | 678 | 1125 | $424,125 | $942,500 | $70,048,926 |
Bolton, Town of | Rehab/ Replacement of Existing Facilities | 39041 | 665 | 640 | $118,188 | $337,681 | $70,386,607 |
Hattiesburg, City of | Rehab/ Replacement of Existing Facilities | 39403 | 638 | 45951 | $500,000 | $11,903,000 | $82,289,607 |
Acona Water Association | Rehab/ Replacement of Existing Facilities | 39095 | 604 | 1550 | $638,910 | $1,419,800 | $83,709,407 |
Harland Creek Water Association | Rehab/ Replacement of Existing Facilities | 39095 | 554 | 1338 | $500,000 | $2,484,300 | $86,193,707 |
East Madison Water Assn.,Inc. | Distribution Improvements | 39046 | 544 | 7265 | $500,000 | $5,000,000 | $91,193,707 |
Poorhouse Water Association | New Main, Distribution Improvements | 38902 | 494 | 4550 | $0 | $2,543,800 | $93,737,507 |
Mendenhall, City of | New 500 GPM Well/250,000 Gal Tank/Treament | 39114 | 476 | 2504 | $500,000 | $2,634,100 | $96,371,607 |
Topisaw Creek Water Assn. | Rehab/ Replacement of Existing Facilities | 39662 | 473 | 4910 | $477,750 | $3,185,000 | $99,556,607 |
Magnolia, City of | Rehab/ Replacement of Existing Facilities | 39652 | 471 | 2420 | $500,000 | $2,798,860 | $102,355,467 |
Greenville, City of | Rehab Facilities | 38701 | 459 | 30000 | $500,000 | $40,000,000 | $142,355,467 |
Looxahoma Water Assn. | Distribution Improvement/ AMR Upgrade | 38668 | 457 | 686 | $0 | $500,000 | $142,855,467 |
Lake Eddins | Rehab/ Replacement of Existing Facilities | 39347 | 419 | 294 | $500,000 | $1,369,941 | $144,225,408 |
Big Field Water Association | Rehab/ Replacement of Existing Facilities | 38646 | 371 | 599 | $383,426 | $852,057 | $145,077,465 |
Multi-Mart Water Association | Rehab/ Replacement of Existing Facilities | 39452 | 345 | 950 | $83,293 | $333,172 | $145,410,637 |
Paynes Water Association | Rehab Existing Facilities | 38921 | 330 | 549 | $0 | $917,061 | $146,327,698 |
Lumberton, City of | Replace Existing Water Lines/Mains | 39455 | 328 | 2200 | $500,000 | $3,453,197 | $149,780,895 |
Culkin Water District | Rehab/ Replacement of Existing Facilities | 39183 | 324 | 11409 | $500,000 | $10,473,600 | $160,254,495 |
Fannin Water Association | New 300,000-Gal Tank | 39047 | 297 | 6500 | $0 | $3,372,320 | $163,626,815 |
Morton, City of | New Well/ New Water Mains/ Rehab Tank | 39117 | 292 | 7000 | $0 | $7,000,000 | $170,626,815 |
East Leflore Water & Sewer District | Rehab/ Replacement of Existing Facilities | 38930 | 264 | 5161 | $500,000 | $11,168,871 | $181,795,686 |
Cross-Roads Water Assn. | Rehab/ Replacement of Existing Facilities | 38916 | 221 | 1600 | $500,000 | $3,057,336 | $184,853,022 |
Stonewall, Town of | Rehab/ Replacement of Existing Facilities | 39363 | 220 | 933 | $500,000 | $3,300,725 | $188,153,747 |
Hatten Water Association | New Facility, New Well, New Water Mains | 39168 | 180 | 1182 | $500,000 | $2,304,648 | $190,458,395 |
Pachuta, Village of | Rehab/ Replacement of Existing Facilities | 39347 | 165 | 143 | $426,665 | $948,145 | $191,406,540 |
McCarley Water Assn. | Rehab/ Replacement of Existing Facilities | 38943 | 153 | 647 | $0 | $2,394,289 | $193,800,829 |
Neely Utilities | New Storage/ Extend to Unserved Area | 39461 | 132 | 499 | $0 | $1,343,992 | $195,144,821 |
Cleaveland, City of | Rehab Existing Facilities | 38732 | 119 | 12000 | $500,000 | $2,114,701 | $197,259,522 |
Starkville, City of | Replace Existing Water Main | 39759 | 110 | 25339 | $0 | $1,850,000 | $199,109,522 |
Pittsboro, Town of | Rehab/ Replacement of Existing Facilities | 38951 | 100 | 1077 | $0 | $4,055,512 | $203,165,034 |
Morgan City Water Assn. | Rehab/ Replacement of Existing Facilities | 38946 | 97 | 250 | $0 | $1,552,953 | $204,717,987 |
Mount Olive, Town of | New Water Treatment Plant | 39119 | 51 | 982 | $0 | $2,000,000 | $206,717,987 |
Valley Park Water Association, Inc. | Water System Improvements | 39177 | 23 | 448 | $175,077 | $500,221 | $207,218,208 |
Category XII: Consolidation Projects | |||||||
Jackson Co. Utility Authority | Consolidation | 39567 | 76 | 75000 | $0 | $31,750,000 | $238,968,208 |
Jackson Co. Utility Authority | Consolidation | 39567 | 71 | 75000 | $0 | $1,270,000 | $240,238,208 |
Jackson Co. Utility Authority | Consolidation | 39567 | 32 | 6600 | $0 | $279,400 | $240,517,608 |
Jackson Co. Utility Authority | Consolidation | 39567 | 0 | 12000 | $0 | $2,540,000 | $243,057,608 |
33 Miss. Code. R. 13-VII
See section VLB. of this document for more details. Applications exceeding $5,000,000 amount require further approval by the Board. See section IV.C.1 of this document.