30 Miss. Code. R. 901-21.2

Current through August 31, 2024
Rule 30-901-21.2

Attesting to Quality and Responsibility for Surveys

To provide the client with the assurance that the work was performed under the direct supervision of a licensee, and was performed to a certain standard, documentation shall be sealed and signed by the licensee in responsible charge, including, but not limited to, the following:

1. When a boundary, route, easement, or lease survey is performed, a plat shall be prepared and the plat shall bear the seal and signature of the Professional Surveyor in responsible charge.
2. When a topographic survey, hydrographic survey or construction survey is performed at the request of a client, any plat, map or report that is the final product of that licensee for that project shall be sealed and signed by the Professional Surveyor or the Professional Engineer in responsible charge. If a topographic survey, hydrographic survey or construction survey is performed by a licensee to obtain data to be used by that licensee to perform calculations or to be incorporated into a final product of that project, then the final product of that project shall be sealed and signed by the Professional Surveyor or the Professional Engineer in responsible charge.

30 Miss. Code. R. 901-21.2

Miss. Code Ann. § 73-13-15
Amended 8/1/2015
Amended 4/15/2017