As new contracts are let to perform work on the Port, the Port's Contract Monitor identifies:
In the event a contractor has prepaid material, will be dealing with material belonging to the Port, or has material to be left on the Port, the Contract Monitor will provide to the Port Operations and Captain of Security a description of the material.
28 Miss. Code. R. 301-28.5