The manufacturer, retailer, developer or installer/transporter may agree in writing to allow the consumer to conduct the site preparation for the Factory-Built home installation. However, before the installer/transporter may begin installation of the Factory-Built home, the site preparation must meet the requirements set forth in MH-5, as amended. If there is conflict between the installer/transporter and the consumer regarding the site preparation, the State Fire Marshal's Office may be required to mediate. Any fee charged by the State Fire Marshal's Office due to said mediation will be paid by the consumer.
19 Miss. Code. R. 7-5.02.4.8