19 Miss. Code. R. 7-3.03.5.10

Current through November 26, 2024
Section 19-7-3.03.5.10 - Initial Plant Certification Inspection
A. No data plate shall be affixed to any modular home or component until the approved construction inspection agency has completed an initial plant certification inspection of the manufacturer's facility.
B. The initial plant certification inspection shall consist of a complete evaluation of the manufacturer's adherence to its compliance assurance program and capability of producing unit or component in accordance with approved building system.
C. The approved construction inspection agency shall become familiar with every aspect of the manufacturer's approved building system and compliance assurance program.
D. The approved construction inspection agency shall make a complete inspection of the manufacturer of at least one (1) modular building unit and any component(s) pertaining to that particular unit throughout all of the operation in the facility. If the first unit or component inspected fails to conform to the Standards defined herein, additional units or components shall be similarly inspected until the agency is satisfied that the manufacturer is complying with an approved building system and the Standards defined herein.

19 Miss. Code. R. 7-3.03.5.10

Miss. Code Ann. § 75-49-5 (Supp. 2013).
Amended 1/1/2015