Within thirty (30) days after the signing of the Contract, the Contractor will submit to the Professional five (5) copies of a complete list of all products which are proposed for installation. The list should be tabulated by specification section.
Within thirty (30) days after the signing of the Contract, the Contractor will submit to the Professional five (5) copies of a list indicating all products he proposes for substitution. This list should include:
Product List |
* Manufacturer's name and address |
* Trade name |
* Model or catalog designation |
* Manufacturer's data |
* Performance and test data |
* Reference standards |
12 Miss. Code. R. 3-20-700.5