Section 12-3-20-700.3 - CONSTRUCTION SCHEDULE

The Contractor will furnish the Owner and Professional with two (2) copies of a construction schedule for the entire Work within fifteen (15) days after the issuance of the Notice to Proceed. This schedule will be revised each month and forwarded to the Owner and Professional each time.

12 Miss. Code. R. 3-20-700.3

Adopted 11/25/2016
Amended 3/15/2021