12 Miss. Code. R. 3-2.1-600.1

Current through December 10, 2024
Section 12-3-2.1-600.1 - PLANNING PHASES

* Program Phase

* Schematic Design Phase

* Design Development Phase

* Construction Document Phase

* Bidding Phase

Each funded Project goes through a planning process delineated by the Bureau and stipulated in the Professional's Contract as basic services.

The following guidelines have been developed to achieve the planning process.

12 Miss. Code. R. 3-2.1-600.1

Amended 8/14/2016