Section 12-3-2.1-1-01900-1-1.01 - WORK SEQUENCE
A. Owner will occupy the building during construction, coordinate with Owner's Representative in scheduling work to vacate the areas as the Contractor requires.
B. Construct work in stages as follows:
1. __________________________________________________
2. __________________________________________________
3. _____________________________________________