Current through December 10, 2024
Rule 11-5-1.4 - Immediate Response Action Contractor (IRAC) Application ProcessA. IRAC's shall be responsible for response actions on an immediate basis which may at a minimum include planning, designing, construction, and services related to any discharge, release, or threatened release of motor fuels. The Department shall determine when a release necessitates an immediate response from an IRAC.B. To be considered for listing as an IRAC, an applicant must submit a completed application to the Department's Underground Storage Tank Branch. The application must contain at a minimum, the following documentation:(1) copy of a current certificate of responsibility issued by the State of Mississippi Board of Contractors;(2) copy of a current certificate of insurance showing coverage of at least one million dollars ($1,000,000.00) under the contractor's general liability insurance;(3) copy of a current certification from the Department for a full-time (40 hours per week) employee of the company to permanently close UST systems;(4) copies of certificates of applicable Occupational Safety and Health Administration (OSHA) training for all personnel who will be on site during UST related work;(5) evidence that the applicant has successfully completed at least three (3) jobs within one year prior to application submittal. Such jobs must have involved remediation of soils or water at UST sites;(6) signed certification affidavit that the applicant can meet and maintain the requirements of Rule 1.5 and 1.6 of these regulations; and(7) other appropriate documentation as required by the Department.Miss. Code Ann. §§ 49-2-9(1)(b), 49-17-17(i), 49-17-401, et seq., 49-2-1, et seq. and 49-17-1, et seq.