No commercial hazardous waste management facility shall be established or expanded in a 100-year floodplain unless the permit applicant can demonstrate to the satisfaction of the Permit Board that the proposed facility will not restrict the flow of the 100-year flood, reduce the temporary water storage capacity of the floodplain, or result in washout of hazardous waste so as to pose a hazard to human health or the environment.
No hazardous waste management facility shall be established or expanded if, on the date the permit application is submitted to the Department, the site would be in conflict with lawful regulations or ordinances of state agencies, or local governments.
The Permit Board may require such reasonable restrictions and limitations as it deems appropriate regarding the primary transportation route(s) to the facility if it should determine that the primary route(s) of transportation to the facility by hazardous waste hauling vehicles would significantly increase the safety risks within the ten (10) mile radius.
No commercial hazardous waste management facility shall be established or expanded unless the applicant for a permit for the facility can demonstrate to the Permit Board that the facility shall be located, configured, designed, constructed, and operated such that the noise level at the facility boundary caused by normal waste management operations of the facility but not by vehicular movement into or out of the facility will not exceed an eight-hour time weighted average (TWA) of 65 decibels between the hours of 7 a.m. and 7 p.m. or an eight-hour TWA of 55 decibels between the hours of 7 p.m. and 7 a.m.
The Permit Board may establish buffer zone requirements in addition to or more stringent than the minimums prescribed in this section for new or expanding commercial hazardous waste management facilities, and all buffer zone requirements around all other new or expanding hazardous waste management facilities, all as may be required for protection of the public health or environment or because of the proximity of such things as individual residences, roadways, waterways, commercial establishments, existing or abandoned solid or hazardous waste facilities or other natural or man-made structures, on a case-by-case basis using good engineering judgment.
Within sixty (60) days after the date on which an application for a permit to establish or expand a commercial hazardous waste landfill is filed with the Department, the applicant shall give notice of the filing to all landowners within one-half (1/2) mile of the property line of the proposed facility.
11 Miss. Code. R. 3-1.9