Unless otherwise approved in a waste tire facility closure plan, the owner or operator shall within 90 days complete the closure procedures of subpart 2.
If the conditions of part 9220.0490, subpart 1, exist, the owner or operator shall:
If a waste tire processing facility is not available to accept the waste tires removed under subpart 2, item E, the commissioner shall approve shipment of the waste tires to a waste tire storage or transfer facility willing and able to accept the waste tires.
After receiving certification from the owner or operator of the facility that the closure procedures have been completed in accordance with subpart 2, the commissioner shall inspect the facility site. If all procedures have been correctly completed, the commissioner shall verify that the facility has been closed in compliance with parts 9220.0440 to 9220.0500, and that all duties established by parts 9220.0440 to 9220.0500, and by the facility permit, have been discharged.
Minn. R. agency 167, ch. 9220, WASTE TIRE FACILITY STANDARDS, pt. 9220.0500
Statutory Authority: MS s 115A.914