Minn. R. Part 9220.0570

Current through Register Vol. 48, No. 51, June 17, 2024
Part 9220.0570 - COST ESTIMATE FOR CLOSURE
Subpart 1.Average cost of closure estimate.

The commissioner shall calculate the average cost of closure of a waste tire facility by examining the cost of transportation of waste tires to processing facilities and the average cost of processing waste tires in the state. The commissioner shall express the average cost of closure through use of a per tire average cost figure.

Subp. 2.Amount.

The amount of financial assurance to be provided by the owner or operator of a waste tire facility must be greater than or equal to the closure cost estimate derived by multiplying the commissioner's estimate of the per tire statewide average cost of closure by the maximum number of tires that will be maintained at the facility as stated in the permit application part 9220.0270, subpart 3, item B.

Minn. R. Part 9220.0570

12 SR 2513; L 1999 c 73 s 5

Statutory Authority: MS s 115A.914