Following the initial incorporation of petroleum contaminated soil into the native soil under part 7037.2300, the plot may be seeded to a crop. No root crops or crops for direct human consumption may be grown during the period of time when soil monitoring under part 7037.2700 is performed. If seeding is delayed, the tillage schedule given in part 7037.2400 must be followed until seeding can be done.
Minn. R. agency 167, ch. 7037, pt. 7037.2500
Statutory Authority: MS s 116.07