Items A to M apply to trust funds:
payment = | CE _____ Y x 12 |
where CE is the sum of the current cost estimates and Y is the number of years remaining in the operating life of the site. Subsequent payments must be made no later than the last day of the month following the previous payment. The amount of each subsequent payment must be determined by this formula:
payment = | CE - CV _____ Y x 12 |
where CE is the sum of the current cost estimates, CV is the current value of the trust fund, and Y is the number of years remaining in the operating life of the site.
The operating life of the site must be determined by the following formula:
Y = | DC _____ A x W x (1+B) |
where:
DC = the design capacity of the site,
A = the ratio of loose to compacted waste volume achieved at the site,
B = the ratio of the volume of cover material (both intermittent and final) to waste receipts at the site, and
W = the weighted five-year moving average of reported annual waste receipts.
The weights applied to the annual waste receipts are:
previous year = .50
two years ago = .25
three years ago = .15
four years ago = .07
five years ago = .03
The commissioner shall decide whether to withhold reimbursement based on changes in unit costs incurred. If costs per unit incurred at the site exceed contingency allowances made in cost estimates, the commissioner may withhold reimbursement. The commissioner shall, within 30 days of the decision, provide the owner or operator with written reasons for withholding reimbursement.
Minn. R. agency 167, ch. 7035, SOLID WASTE MANAGEMENT FACILITIES FINANCIAL REQUIREMENTS, pt. 7035.2705
Statutory Authority: MS s 115.03; 116.07