The following annual fee shall be paid by a permittee that has received a major NPDES permit:
Design Flow in Million Gallons per Day (MGD) | Annual Fee | |
50 and over | $175,500 | |
20 to 49.99 | $40,350 | |
5 to 19.99 | $14,350 | |
Up to 4.99 | $5,900 |
Design Flow in Million Gallons per Day (MGD) | Annual Fee | |
20 to 49.99 | $44,200 | |
5 to 19.99 | $18,250 | |
Up to 4.99 | $8,450 | |
Cooling or mine pit dewatering (any flow) | $16,900 |
The following annual fee shall be paid by a permittee not designated as a major NPDES facility and by a permittee that has received a state disposal system permit.
Design Flow in Million Gallons per Day (MGD) | Annual Fee | |
Greater than .100 | $1,450 | |
0 to .100 | $505 | |
Facilities for the treatment or storage of biosolids only | $500 |
Design Flow in Million Gallons per Day (MGD) | Annual Fee | |
Sewage 0 to .100 | $495 | |
Individual storm water permits | $1,230 | |
Other nonmunicipal (any flow) | $1,230 |
The following annual fee shall be paid by a permittee that received a general permit as defined in part 7001.0010, subpart 4.
Annual Fee | ||
General | $345 | |
General industrial storm water permit | $400 | |
General construction storm water permit | 0 | |
General MS4 storm water permit | 0 |
Minn. R. agency 167, ch. 7002, WATER QUALITY PERMIT FEES, pt. 7002.0310
Statutory Authority: MS s 16A.128; 115.03; 116.07