In addition to the requirements of this chapter and chapter 7035, after January 1, 2011, an applicant for a solid waste land disposal facility permit that is not a contiguous expansion of a permitted facility or a noncontiguous expansion within 600 yards of a permitted facility must demonstrate to the commissioner that the facility meets the additional requirements of this part, unless that facility will accept only demolition and construction debris and incidental packaging or that facility will accept only industrial waste that is limited to wood, concrete, porcelain fixtures, shingles, or window glass resulting from the manufacture of building materials.
The applicant must comply with parts 7001.3175, 7001.3200, and 7001.3275.
The applicant must demonstrate to the commissioner using testable or otherwise objective data that the proposed landfill site meets the criteria in item A or B and the criteria in items C and D. The applicant must provide a certification for site and groundwater conditions from a professional geologist licensed in Minnesota and a certification for structural conditions from a professional engineer licensed in Minnesota.
Minn. R. agency 167, ch. 7001, SOLID WASTE MANAGEMENT FACILITY PERMITS, pt. 7001.3111
Statutory Authority: MS s 116.07