Except as provided in subpart 2 or 3, the agency shall issue all hazardous waste facility permits in accordance with part 7001.0140.
For a draft permit that concerns a new hazardous waste thermal treatment facility prepared under part 7001.0700, the agency shall issue a hazardous waste facility permit authorizing construction and operation of the proposed facility, requiring the permittee to conduct trial burns, and requiring submission of the results of the trial burns if the agency finds that the proposed facility is likely to qualify for a permit authorizing the operation of the facility under appropriate operating conditions as required by part 7045.0542, subpart 6, and as necessary for the permittee to comply with the performance standards set forth in part 7045.0542, subpart 4. This permit is subject to modification of the operating conditions to reflect the results of the trial burn and to ensure compliance with the standards set forth in part 7045.0542.
For a draft short-term demonstration or two-phase permit concerning a new hazardous waste land treatment facility prepared under part 7001.0710, the agency shall issue a hazardous waste facility permit authorizing the treatment demonstration and requiring submission of the results of the demonstration if the agency finds that the proposed facility is likely to qualify for a permit authorizing the operation of the facility under appropriate operating conditions as required by part 7045.0536, subpart 4, and as necessary for the permittee to comply with the groundwater protection standards of part 7045.0484 and the performance standards set forth in part 7045.0536. This two-phase permit is subject to modification of the operating conditions to reflect the results of the treatment demonstration and to ensure compliance with the standards set forth in parts 7045.0484 and 7045.0536.
Minn. R. agency 167, ch. 7001, HAZARDOUS WASTE FACILITY PERMITS, pt. 7001.0680
Statutory Authority: MS s 116.07