For procedures identified in part 5221.4060, subpart 2d, with indicator 5 in column S, the rules in items A to D apply to establish the maximum fee according to the formula in part 5221.4020, subpart 1b.
Unadjusted Maximum Fee, Procedure 1 Unit 1 | Unadjusted Maximum Fee, Procedure 1 Unit 2 | Unadjusted Maximum Fee, Procedure 2 | Total Adjusted Maximum Fee | Calculation of Total Adjusted Maximum Fee | |
Work | $7 | $7 | $11 | $25 | No reduction |
PE | $10 | $10 | $8 | $19 | $10 + (.50x$10) + (.50 x $8) |
Mal-practice | $1 | $1 | $1 | $3 | No reduction |
Total | $18 | $18 | $20 | $47 | $18 + ($7 + $1) + (.50 x $10)+ ($11 + $1) + (.50 x $8) |
For purposes of the workers' compensation fee schedule, CPT code 97014, electrical stimulation therapy, is subject to the multiple procedure payment reduction provided in subpart 1. Indicator 9 in column S of the RVU table does not apply to CPT code 97014.
If the extraspinal code (98943) is used in conjunction with any of the spinal chiropractic manipulative treatment (CMT) codes (98940 to 98942) on the same day, the extraspinal code must be coded with CPT modifier 51. The CPT modifier 51 reduces the RVU of 98943 when used in conjunction with any of the CMT codes (98940 to 98942) on the same day by 50 percent.
For diagnostic imaging procedures with an indicator of 4 in column S, special rules for the technical component and professional component (PC) apply if the procedure is billed with another diagnostic imaging procedure with indicator 88 in column AB. If the procedure is furnished by the same provider, or different providers in the same group practice, to the same patient in the same session on the same day as another procedure with indicator 88, the procedures must be ranked according to the maximum fee for the technical component and professional component, calculated according to the formula in part 5221.4020, subpart 1b. The technical component with the highest maximum fee is paid at 100 percent, and the technical component of each subsequent procedure is paid at 50 percent. The professional component with the highest maximum fee is paid at 100 percent, and the professional component of each subsequent procedure is paid at 95 percent. For example (for illustrative purposes):
Unadjusted Maximum Fee, Procedure 1 | Unadjusted Maximum Fee, Procedure 2 | Total Adjusted Maximum Fee | Calculation of Total Adjusted Maximum Fee | |
PC | $100 | $80 | $160 | $176 ($100 + (.95 x $80)) |
TC | $500 | $400 | $700 | $700 ($500 + (.50 x $400)) |
Global | $600 | $480 | $860 ($600 + (.75 x $80) + (.50 x $400)) | $876 ($600 + (.95 x $80) + (.50 x $400)) |
Minn. R. agency 151, ch. 5221, pt. 5221.4061
Statutory Authority: MS s 14.38; 14.386; 14.388; 175.171; 176.101; 176.135; 176.1351; 176.136; 176.231; 176.83