Minn. R. agency 151, ch. 3801, REGULATION OF ELECTRICIANS, pt. 3801.3770

Current through Register Vol. 49, No. 24, December 9, 2024
Part 3801.3770 - ROUGH-IN INSPECTION OF WIRING TO BE CONCEALED

Where wiring is to be concealed, the inspector must be notified sufficiently in advance to permit completion of a rough-in inspection before concealment, exclusive of Saturdays, Sundays, and holidays. In the event wiring is concealed before rough-in inspection without adequate notice having been given to the inspector, the person responsible for having enclosed the wiring shall be responsible for all costs resulting from uncovering and replacing the cover material.

Minn. R. agency 151, ch. 3801, REGULATION OF ELECTRICIANS, pt. 3801.3770

14 SR 518

Statutory Authority: MS s 326.241