When an asbestos project design is prepared, it must be prepared according to this part and signed by the asbestos project designer.
The asbestos project designer must have a current asbestos project designer certificate at the location where the asbestos project designer is conducting work, except as provided in part 4620.3350, subpart 6, item A. The asbestos project designer must include in the asbestos project design a photocopy of the current asbestos project designer certificate of the asbestos project designer who prepared the asbestos project design.
The asbestos project designer must include in the asbestos project design the method for complying with all applicable work practice requirements of parts 4620.3000 to 4620.3724. The asbestos project design must address:
Minn. R. agency 144, ch. 4620, ASBESTOS ABATEMENT, pt. 4620.3480
Statutory Authority: MS s 144.05; 326.70 to 326.81