Minn. R. 7835.0400

Current through Register Vol. 48, No. 51, June 17, 2024
Part 7835.0400 - FILING OPTION

If, after the January 1, 2015, filing, schedule C is the only change in the cogeneration and small power production tariff to be filed in a subsequent year, the utility may notify the commission in writing, by the date the tariff is due, that there is no other change in the tariff. This notification and new schedule C will serve as a substitute for the refiling of the complete tariff in that year.

Minn. R. 7835.0400

9 SR 993
40 SR 348

Statutory Authority: MS s 216A.05; 216B.08; 216B.164