Subpart 1.General.Costs for soil boring advancement are as described in this part.
Subp. 2.Hollow-stem auger.Hollow-stem auger drilling in sand, silt, or clay, with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
B. 26 - 50 feet, $847 plus $29 per foot beyond 25 feet;C. 51 - 100 feet, $1,573 plus $29 per foot beyond 50 feet; andD. over 100 feet, $4,114 plus $64 per foot beyond 100 feet.Subp. 3.Mud or air rotary.Mud or air rotary drilling in limestone or hard rock, with surface sampling only. Items A to D list the depth of the boring and the maximum cost per boring:
B. 26 - 50 feet, $1,543 plus $48 per foot beyond 25 feet;C. 51 - 100 feet, $2,753 plus $56 per foot beyond 50 feet; andD. over 100 feet, $5,536 plus $73 per foot beyond 100 feet.Subp. 4.Air coring.Air coring of limestone or hard rock with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
B. 26 - 50 feet, $1,694 plus $55 per foot beyond 25 feet;C. 51 - 100 feet, $3,066 plus $57 per foot beyond 50 feet; andD. over 100 feet, $5,899 plus $81 per foot beyond 100 feet.Subp. 5.Rotosonic drilling.Rotosonic drilling in sand, silt, or clay, with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
B. 26 - 50 feet, $1,755 plus $72 per foot beyond 25 feet;C. 51 - 100 feet, $3,540 plus $77 per foot beyond 50 feet; andD. over 100 feet, $7,412 plus $101 per foot beyond 100 feet.Minn. R. agency 120, ch. 2890, pt. 2890.3300
28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f)Statutory Authority: MS s 115C.07