Mich. Admin. Code R. 460.20413

Current through Vol. 24-21, December 1, 2024
Section R. 460.20413 - Underground clearances

Rule 413. In addition to the requirements set forth in 49 C.F.R.§192.325, which is adopted by reference in R 460.20606, an operator of pipeline facilities used in the transportation of sour gas shall, if practical, install the pipeline with not less than 48 inches of clearance from all other underground structures not associated with the pipeline. If this clearance cannot be practicably attained, the pipeline shall be protected from damage that might result due to its proximity to the other structure or structures.

Mich. Admin. Code R. 460.20413

2003 AACS