Section R. 460.20315 - Leaks occurring during uprating; repairs and monitoring requiredRule 315.
(1) In addition to the requirements contained in 49 C.F.R. §192.553, which is adopted by reference in R 460.20606, if the new and higher maximum allowable operating pressure will be more than 10 psig, then an operator shall expose and repair and monitor a leak that is detected during the uprating operation.(2) An operator shall file a complete copy of the written plan described in 49 C.F.R. §192.553(c), which is adopted by reference in R 460.20606, with the commission not less than 30 calendar days before commencement of a project.Mich. Admin. Code R. 460.20315