Mich. Admin. Code R. 29.2191

Current through Vol. 24-22, December 15, 2024
Section R. 29.2191 - General requirements

Rule 91. Section 280.251 is added as adopted from the July 15, 2015, EPA-UST rules as follows:

Section 280.251 General requirements.

(a) Implementation of requirements. Owners and operators shall comply with the requirements of this part for UST systems with field-constructed tanks and airport hydrant systems as follows:
(1) For UST systems installed on or before October 13, 2015 the requirements are effective according to the following schedule:

Requirement

Effective date

Upgrading UST systems; general operating requirements; and operator training

October 13, 2018

Release detection

October 13, 2018

Release reporting, response, and investigation; closure; financial responsibility and notification (except as provided in paragraph (b) of this section).

October 13, 2015

(2) For UST systems installed after October 13, 2015, the requirements apply at installation.
(b) Not later than October 13, 2018, all owners of previously deferred UST systems shall submit a one-time notice of tank system existence to the implementing agency, using the form in appendix I of these rules or a state form in accordance with subsection 280.22(c). Owners and operators of UST systems in use as of October 13, 2015 shall demonstrate financial responsibility at the time of submission of the notification form.
(c) Except as provided in section 280.252, owners and operators shall comply with the requirements of subparts A through H and J of these rules.
(d) Owners and operators may use nationally recognized codes of practice and military construction criteria, such as Unified Facilities Criteria (UFC) 346001, Petroleum Fuel Facilities, when designing, constructing, and installing airport hydrant systems and UST systems with field-constructed tanks.

Mich. Admin. Code R. 29.2191

2018 MR 21, Eff. 11/14/2018