Current through Vol. 24-19, November 1, 2024
Section R. 408.30509 - Frame and masonry inspectionRule 509. Section R109.1.4 of the code is amended to read as follows:
R109.1.4. Frame and masonry inspection. Inspection of framing construction shall be made after the roof, all framing, firestopping, draftstopping, and bracing are in place and after the plumbing, mechanical, and electrical rough inspections are approved. Masonry inspections shall be made after the completed installation of base course flashing as specified in section R703.7.5 of the code and water-resistive barrier as specified in section R703.2 of the code and after the masonry construction is completed.Mich. Admin. Code R. 408.30509