Current through Vol. 24-19, November 1, 2024
Section R. 408.31165 - Finished product controlRule 1165.
(1) Procedure for final inspection of all premanufactured units or building components before shipment to the site or storage point, including identification and labeling.(2) Procedures for handling and storing all finished premanufactured units or building components, both at the manufacturing plant or other storage point and after delivery to the building site.(3) Procedures for packing, packaging, and shipping operations and related inspections.(4) Procedures for transportation, including all measures to protect against damage while in transit, and setting forth the modes of transportation to be utilized and the carrying equipment and procedures.Mich. Admin. Code R. 408.31165