Mich. Admin. Code R. 408.12017

Current through Vol. 24-21, December 1, 2024
Section R. 408.12017 - Hoisting brakes; equipment handling molten metal

Rule 2017.

(1) Each independent hoisting unit on a crane or monorail hoisting equipment handling molten metal shall be equipped with not less than 2 holding brakes.
(2) A single brake is permitted where a hot metal monorail hoist is equipped with physical stops limiting ladle travel.

Mich. Admin. Code R. 408.12017

1990 AACS