Current through Vol. 24-21, December 1, 2024
Section R. 408.11262 - Welding drums, barrels, tanks, or other containersRule 1262.
(1) Welding or cutting shall not be performed on drums, barrels, tanks, or other containers until they have been cleaned of all flammable combustible or toxic materials or fumes.(2) All pipe lines or other connections to drums, barrels, or tanks shall be disconnected or blanked.(3) Hollow spaces or cavities shall be vented and either filled with water or purged with an inert gas before preheating, cutting, or welding.(4) An opening shall be maintained during welding and cutting to vent gases or vapors.(5) The welded construction of a transmission pipeline shall be conducted in accordance with API 1104 "Standard for Welding Pipe Lines and Related Facilities," 1973 edition, as adopted in R 408.11202.(6) The connection, by welding, of branches to a pipeline carrying a flammable substance shall be performed in accordance with API PSD 2201 "Welding or Hot Tapping on Equipment Containing Flammables," 1963 edition, as adopted in R 408.11202.Mich. Admin. Code R. 408.11262
An obvious error in R 408.11262 was corrected at the request of the promulgating agency, pursuant to Section 56 of 1969 PA 306, as amended by 2000 PA 262, MCL 24.256. The rule containing the error was published in Michigan Register, 2013 MR 11. The memorandum requesting the correction was published in Michigan Register, 2013 MR 21