Current through Vol. 24-24, January 15, 2025
Section R. 323.1710 - Standards and specificationsRule 1710. A person shall complete all temporary and permanent erosion and sedimentation control measures according to the approved plan or operating procedures.
(1) A person shall install and maintain control measures in accordance with the standards and specifications of all of the following: (a) The product manufacturer.(b) The local conservation district.(d) The Michigan department of transportation.(e) The enforcing agency, if applicable and formally adopted.(2) If a conflict exists between the standards and specifications, then the enforcing agency or authorized public agency shall determine which specifications are appropriate for the project.Mich. Admin. Code R. 323.1710