Current through Vol. 24-23, January 1, 2025
Section R. 324.605 - Capacity tests for prorated wellsRule 605.
(1) The supervisor or authorized representative of the supervisor may require capacity tests, including test requirements and reporting on wells subject to proration. The supervisor may amend or abrogate a previously adopted test requirement, or set up new test requirements, when necessary to adapt to changing field conditions.(2) A wide open capacity test of a well shall not be made if the test will create waste or result in the coning of gas or water. All gauges and tests shall be made by methods and at times that will result in a determination of the true productive capacity of the wells under normal operating conditions. Reports submitted to the supervisor or authorized representative of the supervisor shall be certified by the permittee or an authorized representative of the permittee.Mich. Admin. Code R. 324.605