Rule 21. Unless otherwise authorized by the supervisor, surface overburden removed in the development of an open pit shall be stockpiled separately from other materials.
Mich. Admin. Code R. 425.21
Rule 21. Unless otherwise authorized by the supervisor, surface overburden removed in the development of an open pit shall be stockpiled separately from other materials.
Mich. Admin. Code R. 425.21