Rule 503. The purpose of the advisory analysis before application is made for a construction permit is to inform the applicant of other permits which may be required for the proposed facility, such as air emissions, water discharge permits, or soil erosion and sedimentation control permits; to provide information on known conditions and other factors which may affect the proposed site; and to discuss the application and submission requirements and procedures.
Mich. Admin. Code R. 299.4503