Current through Vol. 24-23, January 1, 2025
Section R. 299.4316 - Type III landfill operating requirements; daily and interim cover material at construction and demolition waste landfillsRule 316.
(1) A suitable cover material that is in compliance with the provisions of R 299.4429 shall be placed on all exposed solid waste at a construction and demolition waste landfill by the end of each working day, unless the director approves a variance from this requirement based on a demonstration by the owner or operator that controls on the type of waste received and operation of the landfill will adequately prevent fugitive dust, blowing litter, and other nuisances.(2) One foot of compacted cover, which may include the 6-inch daily cover, shall be placed on the surface of any lift that will be exposed for a period of 3 months or more before additional lifts are constructed.Mich. Admin. Code R. 299.4316