Current through Register Vol. 52, No. 1, January 10, 2025
Section 27.02.05.05 - Shoreline Stabilization MeasuresA. Definition. In this regulation, "shoreline stabilization measure" has the meaning stated in COMAR 27.01.01.01.
B. Applicability. The provisions of this regulation do not apply to a structure that is, by necessity, associated with a water-dependent facility under COMAR 27.02.05.04-.04-3.
C. Policies. An agency planning or proposing a shoreline stabilization measure on State-owned land shall follow these policies: (1) Prioritization of the preservation of the natural shoreline;(2) Protection of significantly eroding portions of the shoreline in the Critical Area; and(3) In order to conserve and protect plant, fish, and wildlife habitat, the use of appropriate shoreline stabilization measures that effectively and practically reduce shore erosion.D. Criteria. An agency planning or proposing a shoreline stabilization measure on State-owned land shall satisfy these criteria: (1) In accordance with COMAR 26.24.04.01-1, adherence to the structural shoreline stabilization maps developed and maintained by the Department of the Environment;(2) In accordance with Environment Article, § 16-201(c), Annotated Code of Maryland, and COMAR 26.24.04.01, prohibition of the use of a structural shoreline stabilization measure in an area where no significant shore erosion occurs; and(3) Performance of mitigation measures applicable to the type of shoreline stabilization measure to be undertaken, as specified in the Commission form entitled "Shoreline Stabilization Measure Buffer Management Plan".Md. Code Regs. 27.02.05.05
Regulation .05 adopted effective 50:4 Md. R.111-172, eff. 3/6/2023