Current through Register Vol. 51, No. 22, November 1, 2024
Section 26.11.24.01-1 - Incorporation by ReferenceA. In this chapter, the following CARB approved test methods are incorporated by reference.B. Test Methods Incorporated. (1) Vapor Recovery Test Procedure TP-201.3 Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities, amended March 17, 1999.(2) Vapor Recovery Test Procedure TP-201.5 Determination (By Volume Meter) of Air to Liquid Volume Ratio of Vapor Recovery Systems of Dispensing Facilities, adopted April 12, 1996.(3) Vapor Recovery Test Procedures TP-201.4 Determination of Dynamic Pressure Performance of Vapor Recovery Systems of Dispensing Facilities, amended April 28, 2000.(4) Executive Order G-70-186, Exhibit 4, Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System.(5) Executive Order G-70-165, Exhibit 4, Vapor Return Line Vacuum Integrity Test for the Healy Model 600 System.(6) Leak Rate and Cracking Pressure of Pressure/Vacuum Valves TP-201.1E.(7) Determination of Vapor Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test) TP-201.3C 1999.(8) "Recommended Practices for Installation and Testing of Vapor Recovery Systems at Vehicle Refueling Sites" of the Petroleum Equipment Institute, Section 14, 2009.Md. Code Regs. 26.11.24.01-1
Regulation .01-1 adopted effective April 15, 2002 (29:7 Md. R. 623)
Regulation .01-1 amended effective 42:23 Md. R. 1435, eff.11/23/2015