Based upon monitoring data, if a drinking water supply is impacted as determined by the Department during active operation or during post-closure up to the time of bond release, a permittee shall:
Md. Code Regs. 26.21.04.10
Based upon monitoring data, if a drinking water supply is impacted as determined by the Department during active operation or during post-closure up to the time of bond release, a permittee shall:
Md. Code Regs. 26.21.04.10