Md. Code Regs. 26.17.04.09

Current through Register Vol. 51, No. 25, December 13, 2024
Section 26.17.04.09 - Conduits, Pipes, or Other Devices Pertaining to the Potomac River

The construction, reconstruction, alteration, or addition to any conduit, pipeline, wire cable, trestle, or other device, structure, or apparatus, in, under, through, or over the bed or waters of the Potomac River requires a waterway construction permit from the Administration. Any waterway construction permit issued for this construction shall be subject to the requirements of Regulation .08C of this chapter and permit charges as may be assessed by the Board of Public Works.

Md. Code Regs. 26.17.04.09

Regulation .09E amended as an emergency provision effective June 23, 1980 (7:14 Md. R. 1345); adopted permanently effective November 9, 1980 (7:22 Md. R. 2072)