Current through Register Vol. 51, No. 22, November 1, 2024
Section 20.57.01.02 - DefinitionsA. In this subtitle, the following terms have the meanings indicated.B. Terms Defined. (1) "Chief engineer" means the head of the Engineering Division of the Commission.(2) "Commission" means the Public Service Commission of Maryland.(3) "Compliance order" means a document issued by the Engineering Division to a gas company or gas master meter operator directing compliance.(4) "Consent order" means a document executed jointly by the Engineering Division and a gas company or gas master meter operator under COMAR 20.57.02.07B for the disposition of a case.(5) "Division" means the Engineering Division of the Public Service Commission of Maryland.(6) "Gas" means artificial, natural, or liquified petroleum gas.(7) "Gas company" has the meaning stated in Public Utilities Article, §1-101, Annotated Code of Maryland.(8) "Gas master meter operator" has the meaning stated in Public Utilities Article, §1-101, Annotated Code of Maryland.(9) "Hazardous facility notice" means an order issued by the Division requiring corrective action by the gas company or gas master meter operator.(10) "Incident" has the meaning stated in COMAR 20.55.01.04B(9).(11) "NOPV" means a notice of probable violation issued under COMAR 20.57.02.Md. Code Regs. 20.57.01.02