7-YEAR TRANSITION SCHEDULE*
Crop Year (July 1, previous year-June 30)
Crop Year** | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 |
Average P FIV >450 (Tier C Operations) | PSI | PSI | TM1 | TM1 | TM2 | TM2 | PMT |
Average P FIV 300-450 (Tier B Operations) | PSI | PSI | PSI | TM1 | TM2 | TM2 | PMT |
Average P FIV 150-299 (Tier A Operations) | PSI | PSI | PSI | PSI | TM1 | TM2 | PMT |
PSI-Phosphorus Site Index | |||||||
TM1-Transition Management Phase 1 | |||||||
TM2-Transition Management Phase 2 | |||||||
PMT-Phosphorus Management Tool |
*The 7-Year transition period assumes that the Department, in consultation with the Phosphorus Management Tool Transition Advisory Committee does not make any adjustments to the transition schedule as provided for in this chapter.
**The term "crop year" means the 1-year period beginning July 1 of the previous year through June 30 of the current year. For example, the 2016 crop year begins on July 1, 2015 and ends on June 30, 2016.
Md. Code Regs. 15.20.08.10